Preparation for Quinquennial and Other Works

Preparations Continue:

  • Corse Graveyard Plan completed and copy available in church
  • Outside wall gate pillars repaired
  • Yew trees caged, to be pruned in 2020
  • Entrance slope movement fixed
  • Ancient Church Chest Box treated for Woodworm
  • A new portable PA extension is now available to relay services outside the church when required
  • Outside trenches cleared
  • Elders plants removed from Yew Trees
  • PA System installed for congregation overflows into graveyard  (not for Quinquennial)
  • Lightening Rod to be tested
  • Corse Graveyard Plan to be made available on-line
  • The old oil boiler to be replaced, completed September 2019

 